If spring has stretched your nursery team, it might be time to consider what needs improving while the pressure points are still fresh in your mind.
Perhaps you’re struggling to keep up with potting, spending too much time filling trays by hand, or pulling staff away from crop care to get the next batch through. These bottlenecks can provide a useful starting point for nursery automation and a more productive nursery.
But getting the right machinery in time for your next production peak takes planning. From choosing the best setup to allowing for freight, installation and training, it’s good to start the conversation early.
Where is production getting held up?
When you reflect on your busiest weeks, which jobs take the most hands, create the longest queues, or regularly push other work down the list?
It might be seedlings waiting to be transplanted while the team finishes another potting run. Perhaps manually filling larger pots and bags is physically demanding, or changing between pot sizes takes longer than you would like.
Ask your team where they lose time. They’ll often know exactly which repetitive tasks slow the day down and where automation would make the biggest difference.
Recording a few details can help: the number of plants processed, staff involved, hours spent and frequency of changeovers. This gives you a practical starting point for discussing which improvements could deliver the most value.
Work backwards from your next crop
When do you need the machine contributing to production? Before your next major sowing run? Ahead of transplanting a new batch of plugs? In time to pot on stock for a seasonal sales programme?
Start with that date and work backwards.
Depending on the equipment and configuration, your schedule may need to allow for:
- Reviewing your crops, containers and production requirements.
- Specifying and manufacturing the machine, especially if its customised to your setup.
- International freight and delivery.
- Preparing the site and any required services.
- Installation and staff training.
Lead times vary, so it pays to check availability early. Sometimes we’ve got machines in stock which will shortern the turnaround, while customised equipment requires more forward planning.
Da Ros machines are easy to get the hang of, but staff will still need time to learn the controls, practise changeovers and establish a comfortable workflow before production reaches its peak.
Choose equipment that fits what you grow
A machine’s hourly capacity is only part of the picture. It also needs to suit your plants, growing media, trays, pots and daily workload.
A nursery producing large batches in one tray format will have different requirements from a grower switching between several pot sizes and plant lines throughout the day.
For potting equipment, consider the range of containers you use, how media is supplied and how often settings need to change. For transplanting, plug size, root development and compatibility between propagation trays and receiving containers all matter.
Bring these details into the conversation early. The aim is to find machines that work well with your production requirements and have capacity for the growth you’re planning.
Plan beyond the machine
If you can fill or transplant more plants per hour, what happens next?
Your team still needs to move them into the growing area, space them and get them watered. Growing media needs to reach the machine efficiently, and empty pots and trays need to be close at hand.
Looking at the whole process helps avoid shifting a bottleneck from one task to another. Conveyors, accumulation tables, nursery trolleys, benching and irrigation may all have a part to play.
It’s also worth checking practical requirements such as access, working space and power. Preparing these ahead of time helps installation run smoothly.
Planning in practice at Leithfield Nursery
When Southland’s Leithfield Nursery approached PrimeHort to help transition part of its forestry production from bare-root growing to a containerised system, there was a clear target: capacity to sow 2.5 million pine seedlings, with around nine months from the initial discussion.
The project involved much more than selecting machinery. Site preparation included drainage, power and water supply, followed by a customised Da Ros Seeding Line. Installation was staged so the team could begin sowing while work continued on outdoor benching and irrigation booms.
“The team at PrimeHort have been fantastic to work with, right from the planning stage to the final result,” said Production Manager Darren Cripps.
For growers considering automation, it’s a useful example of working backwards from a crop deadline and allowing time for the whole nursery setup to come together.
Read the full Leithfield Nursery story
Start with the job that will make the biggest difference
You don’t need to automate your entire nursery at once.
A trayfiller could reduce hours of repetitive preparation. A potting or bagging machine could ease physical workloads and help the team keep production moving. A transplanter could add capacity where handling young plants has become a major demand on staff time.
Starting with your biggest bottleneck allows you to make a targeted improvement, while planning how future equipment could fit into the same workflow.
Give your next busy season a head start
Our automation team will help you assess your current workflow and recommend the best Da Ros machinery and complementary equipment to suit your crops, production goals and available space.
Bring us your next production deadline, current output and biggest time-consuming task. Together, we can work through the options, confirm lead times and plan the next step towards a more productive nursery.
What are our most popular machines?
Entry-level nurseries:
Da Ros TV3 Potting Machine
Da Ros TV5 Potting Machine
Da Ros I3P Potting Machine
Da Ros RC7 Trayfiller
Larger nurseries:
Da Ros I5 Potting Machine
Da Ros I7 Potting Machine
Da Ros TP24 Transplanter
Da Ros RC1200 Trayfiller
Ready to grow smarter? Talk to us today.